Sign In | Join Free | My infospaceinc.com
China CHANGZHOU UNITED WIN PACK CO.,LTD logo
CHANGZHOU UNITED WIN PACK CO.,LTD
CHANGZHOU UNITED WIN PACK CO.,LTD
Verified Supplier

5 Years

Home > Tape Extrusion Line >

250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw

CHANGZHOU UNITED WIN PACK CO.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw

  • 1
  • 2
  • 3

Brand Name : United Win

Model Number : SJPL-Z90x33-1100/900

Place of Origin : CHINA

MOQ : 1 set

Price : USD

Payment Terms : L/C, T/T

Supply Ability : 10 Set/Sets Per Month

Packaging Details : Wooden Case

Name : Tape Extrusion Stretching Machine

Max. Capacity : 4500kg/24hr

Design Speed : 250m/Min

Fibre Range : 60-2000tex

Stretching Ratio : 4-10

Working Power : 110kw

Total Weight : 25t

Size : ~38000X4800X2500mm

Condition : New

Contact Now

250m/Min Tape Extrusion Stretching Production Line Hard Wire Extrusion

Descripition:

This series flat yarn extrusion line is designed and developed on the base of introducing and assimilating the up-to-date technologies at home and abroad.

It adopts the international electric digital-simulation control technology such as computer-controlled frequency conversion speed regulation so as to make the main target reach the international advanced level.
Meanwhile, with high production efficiency and high quality of tape tube forming.

As required, this assembly can also be equipped with advanced filter change structure as well as fibrosis structure that is used for producing flexible packaging bags or fibrosis sewing thread.



Technical Parameters:

Item Parameter
Fibre range 60-2000Tex
Design speed 250m/min
max. capacity 4500kg/24hr
Stretching ratio 4-10
Installing power 4-10
Working power 110KW
Size ~38000×4800×2500mm
Total weight 25T



Machine Photos:

250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw

FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)


2. How many days will you finish installing?
We will finish installation and training within 15 days.


3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.


4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.

5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date


6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.


7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.


Product Tags:

Tape Extrusion Stretching Production Line

      

250m/Min Tape Extrusion Production Line

      

110 kw Tape Extrusion Stretching Machine

      
Quality 250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw for sale

250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: CHANGZHOU UNITED WIN PACK CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)